Construction Joints
Construction joints are otherwise called as cold joints. It is used in the normal concrete or the lightweight concrete. Concrete like the other materials has the tendency to expand and contract because of the climatic or different changes and may be because of concrete strain. This change of volume will create the cracks in the hardened concrete, until unless it is controlled by concrete sealers. By arranging provisions for changes in the volume at the selected place, the stress forces that produce cracks can be prevented. These provisions are called control relief joints. This joint will reduce the random cracks on the surface by the stress forces produced by moisture and temperature changes. It will be very effective, if the control relief joint is installed properly. Construction joint is the plain surface between the two elements of the concrete surface. Construction joint is hardened to a level that vibration cannot affect the surface.
Occurring of Cracks
The concrete is mixed to the specified proportions to produce the standardized mixture. During the initial state this mixture will occupies the maximum volume. Then the concrete is dried and looses the uncombined water via evaporation. As said earlier, the moisture loss will produce concrete contraction and reduction in length. Unless the change in volume are restricted by placing the provisions (control relief joint), cracks will occur. When the concrete is restrained or controlled from the contraction, cracks can develop.
Methods of Drying Shrinkage
The concrete should be properly merged. The concrete that is cured soon after the concrete finishing will have the greater strength.
Construction Joints on Concrete Slab
Questions:
| Name* : |
|||||
| Email* : |
|||||
| Country* : |
|||||
| Phone* : |
|||||
| Subject* : |
|||||
| Upload Homework : Upload another homework (upto 5 uploads max.)
|
|||||
| Due Date |
Time |
AM/PM |
Timezone |
||
| Instructions |
|||||
|
|||||